Transport bridge sections
Monday October 22nd the H-282 barge was deployed for the transport of two bridge sections which were damaged earlier this year. Bonn & Mees used one of their sheerleg cranes to load the bridge sections onto the H-282 at steel company Hollandia Infra’s shipyard at Krimpen aan den IJssel.
Once loaded the barge set course to SSN’s shipwrecking yard in ‘s-Gravendeel for the dismantling of the bridge sections.
0 Likes